

Flagship Series
DT Lineup
Six configurations across the DT 80, DT 100 and the new DT 130 series. Pick the chassis and reach that fit your fleet.



Why Cela
Engineered for the Impossible Job
Negative Reach
Drop -16 ft below ground level for bridge inspection and below-grade work without rigging.
Up & Over Clearance
46 ft of horizontal up-and-over reach clears rooftops, walls, and obstacles in a single setup.
Italian Engineering
Built in Cesena, Italy by Cela S.p.A. since 1959. Galvanized booms. 10-year structural warranty.
Operator-First Controls
Proportional joysticks and radio remote. Train experienced operators in under an hour.
Low Maintenance
Sealed slewing rings and self-lubricating boom slides. 500-hour service intervals.
Nationwide Support
Parts in stock in NJ. Certified service techs reach 90% of US sites within 48 hours.


